Horizontal round logs should connect to slabs
MatthiasMann opened this issue ยท 0 comments
I'm using BetterFoliage-MC1.12-2.2.0 and I like to use top slabs for my floors in my buildings. If I have horizontal logs in the floor (see Andyisyoda's 5x5 building system) there is a gap between the rounded horizontal logs and the slabs.
I have enabled connect to solid blocks but that doesn't help with the top slabs.