Class deals with the production line black box of the array
yuanju-qwq opened this issue ยท 0 comments
GregTech CEu Version
2.7.4
Related Problem
In the face of various production lines in the later stage, it is hoped that the number of machines can be reduced, and it also has higher parallelism and produces more resources to face the resource demand in the later stage
Your Solution
gt small machines are needed, the parallel number is based on the number of gt small machines, and the processing speed is based on the level of small machines. The entire production line formula must be cached in advance, so that the small machines can also be used to make the small machines not not available in the later stage
Additional Information
No response