February To-Do List
draknyte1 opened this issue ยท 2 comments
- Add Some Custom Gendustry Frames
- Allow changes to Gendustries power Multiplier
- Large Arc Furnace
- Void Covers
- Naquadah Reactor Mark XII
- Grindle
- XP Convertor
- Factory Grade Distillation Tower #363
- Additional Information hatches for Multiblocks that output Redstone
- Fix Handling of (Dis)Charging Busses.
- Automatic Doors
- Integrated Circuit Programming Machine
- Deep Earth Ore Drilling Rig
Minor issues to resolve prior to an official Release post 1.7.02.09.
This build will be used for the next official, non-beta GTNH release.
Major bugs or minor improvements that can be done within the next few days is all I am to do.
All new content will be suspended until post-release.
- Fix Large Centrifuge animation
- Cutting Factory still cannot be formed. (Inspect others of same shape) #425
- Large Arc Furnace still cannot be formed properly. #368
- Large Electrolyzer destroying correct materials. #388
- Large Electrolyzer recipie conflict. #421
- Fix Control Cores > IV & Re-Do their logic.
- Query validity of Control Cores vs Energy Cores.
- Observe GTNH chat for more bugs.
- Fixed Unused TC aspects
- Add recipes for the Solar Generators. - POSTPONED (To Reimplement)
- Simple Hand pump does not remove fluid from Fluid extractor/canner. #423
- Redo Adv. Vac Freezer handling of Plasmas. #424 - POSTPONED (To Reimplement)