Logistics Pipes

Logistics Pipes

13M Downloads

Liquid Provider Pipe can't pull water from iron tank(railcraft)

kghost opened this issue ยท 5 comments

commented

I set up a simple system, where the supplier fluid pipe connected to buildcraft tank (right) requesting 3000mb water form iron tank (railcraft,left), but only 250mb water is transferred, the provider fluid pipe refuse to provide any more water.

lp

commented

My env:

MC 1.6.4
buildcraft-A-1.6.2-4.1.2
LogisticsPipes-MC1.6.4-0.7.4.dev.79
Railcraft_1.6.2-8.2.0.0

commented

I can check the tank current water volume by using a request pipe, so the iron tank is reporting the correct volume.

commented

Checked in railcraft, the iron tank has a flow limit of 250mb/tick (Railcraft/Railcraft#112)

is there any method to let LP drain fluid that way ?

commented

I've come across the same problem. The work around i have come up with is to use a single Buildcraft tank as a buffer between the Railcraft tank valve and the provider pipe. You can use a standard emerald or wooden fluid pipe to fill the Buildcraft tank.

commented

Should be fixed inside newer builds.