[Suggestion] Improved Pipe Routing
kalutro opened this issue ยท 0 comments
Pipe routing, when multiple pipes occupy the same block, gets chaotic quickly. It seems like the Item Pipe has the lowest priority and gets forced into weird pathing.
In the below screenshot, the Item Pipes and Cables are neat and straight on the left and right machines; Item Pipes on the left and Cables in the middle. You would think introducing some Fluid Pipes would put them on the right, nice and neat. Instead, they get forced to the left and the Item Pipes have to reroute. This seems unnecessary. Is this by design or could this be improved?