CurseFire
CurseFire
Tyr Duna Mission (full station & bases) [Stock]
Shareables
10k Downloads
Updated 10 years ago
Created 10 years ago
Description
Images
Share to
Twitter
Facebook
LinkedIn
Reddit
"Propylaea" Duna base with rover
The rover comes *for free* with the base and can dock to it through it's innovative landing-leg-system! :D
Watch the balance!
Another shot to illustrate the optimal balance, this time from the front of Odin, so you can see most parts from above.
The Odin carrier during the transfer burn
The massive Odin carrier can transport all required parts from Kerbin to Duna. Just make sure to keep the balance, as can be seen in the picture!
Valhalla station
Attached to two docking ports on the side are the Lander (for transfer between Duna surface and the station) and the Taxi (for transfer to Ike surface to the station).
Duna rover detail
Just carefully drive the rover under the docking port and activate the landing legs. They will lift the rover exactly up to the docking port and it will connect without problems.
"Metope" base and "Fenris" rover on Ike
The rover lands with it's own sky crane, the base can hold up to 5 Kerbals.